Space
Narrower aisles and greater height can recover usable storage volume.

Store more, move faster, and reduce unnecessary forklift traffic with an American-built system engineered around the warehouse you already have.
Start the conversation →Wide forklift aisles, unused clear height, traffic congestion, and manual placement all consume capacity. When demand grows, operators often add labor or square footage before getting everything possible from the facility they already pay for.
Narrower aisles and greater height can recover usable storage volume.
Automated travel removes repetitive forklift trips from the core storage task.
Precise positioning and sequencing improve consistency and visibility.

The G90 system moves, stores, and retrieves standardized palletized loads through a configured narrow-aisle environment. It is developed from the operation—not selected from a retail price sheet.
The commercial case is the combined effect of capacity, flow, accuracy, labor exposure, and long-term operating economics.
Use narrower aisles, approved clear height, and project-appropriate depth before adding square footage.
Replace recurring travel and placement decisions with a coordinated movement system.
Limit unnecessary forklift traffic inside the storage environment and simplify pallet flow.
Sequence inventory and stage retrieval based on the approved warehouse controls and operating model.
G90 does not buy a complete overseas machine and apply a label. Structural fabrication, machined components, system engineering, build, installation, and support come from an American team with hands-on knowledge of the equipment.
“Tell us what has to move, where it has to go, and how the operation needs to perform. Then we can engineer the right system.”G90’s straight-shooter sales philosophy
Launch photography should show real G90 systems, components, fabrication, installation, and service. These images are concept placeholders.




Facility, pallets, loads, throughput, shifts, rack, software, and goals.
Evaluate fit, orientation, aisles, capacity, and system interfaces.
Define scope, configuration, assumptions, schedule, and investment.
Fabrication, installation, commissioning, training, and service.
There is no responsible instant price. Give G90 the operating context, and the team will identify what is required to begin a layout and bid.